Sale!

Fortpro ABS Wheel Speed Sensor Kit (98″ Cable) – Long-lead Option for Volvo, Freightliner, Mack & Navistar Trucks (AL364062 – F238923)

Original price was: $43.04.Current price is: $28.69.

In stock

Quantity
SKU: F238923 Category: Brand:

Description

Specifications

  • Product Line: Electrical
  • Category Name: Sensors
  • Part Type: Wheel ABS Sensor
  • Alternate Part Name: Anti-Lock Brake System Sensor, ABS 90 deg. Sensor Body with Clip, ABS Sensor Kit, Wheel Speed Sensor
  • OEM Part Number: AL364062
  • Application Type: Trailers., Heavy Duty Trucks, Semi-Trucks
  • Connector Gender: Female
  • Connector Type: DIN
  • Pin Count: 2
  • Cable Type: TRD
  • Connector Shape: Circular
  • Head Style: Right Angle 90 deg.
  • Overall Length: 98 in.
  • Maximum Operating Temperature: 320 deg. F (160 deg. C)
  • Minimum Operating Temperature: -40 deg. F (-40 deg. C)
  • Sensor Type: Anti-Lock Brake System
  • Net Weight: 0.40 lb.

Bill Of Material

  • 1 Sensor with Cable Lead
  • 1 Retainer Clip
  • 1 pkg Lubricant

Intended Application

  • Compatible with Volvo, Ford, Freightliner, Mack, Navistar, Sterling Heavy Duty Trucks.
  • Installed at wheel ends to measure the motion of a sensed wheel in ABS applications.
  • Always compare with your OEM part number prior to purchase to confirm full compatibility.

Cross-references

  • 364094081, 5396-AL364062, 5396AL364062, 970-5130, 9705130, AL364062, HDXAL364062, MIDAL364062, ZZAL364062

Explore more from our collection.

Reviews

There are no reviews yet.

Be the first to review “Fortpro ABS Wheel Speed Sensor Kit (98″ Cable) – Long-lead Option for Volvo, Freightliner, Mack & Navistar Trucks (AL364062 – F238923)”

Your email address will not be published. Required fields are marked *